Auger.
Crane. (not our usual sandhills)
The pilings that will hold up the house are going in now! The King Company, which is experienced in environmentally sensitive areas, is drilling down to a more stable layer and putting auger cast pilings in. Cement is poured in as the rotating auger is withdrawn from the hole. It's not like a driven pile that makes a lot of noise and vibration while going in.
The house will sit a foot and a half above grade on 19 pilings.
|
||||||
---|---|---|---|---|---|---|
|
No comments:
Post a Comment