Finally, they contacted us to reconfigure the layout so it flowed better with the home's floorplan.
Changes in the works:
- Reconfiguring hallway bathroom by egressing into the laundry room, with a new custom stone tile shower area.
- Extending hallway towards the master bedroom, with a new doorway into the master bedroom.
- Closing up the doorway from laundry room to the master bedroom.
- Extending the walk-in closet to almost double its size.
- Replacing 2 French doors in the master bedroom with windows and new drywall.
- Installing all new stone tile, paint, and fixtures in the hallway, bathroom and laundry room.
A few IN PROGRESS pictures:
No comments:
Post a Comment