We recently renovated 2 bathrooms, the master and the hallway bathrooms, with all new paint, tile, bathtubs/toilets/sinks, and fixtures. The master bathroom was reconfigured to allow for a large 6ft. long X 3.5 wide soaking tub and dual sink vanity. See BEFORE, DURING, and AFTER pictures below.
BEFORE and DURING pictures of the Master Bathroom
BEFORE and DURING pictures of the Master Bathroom



(Hallway Cabinets were removed as part of the Master Bath Reconfiguration)



AFTER pictures of the Master Bathroom





BEFORE picture of the Hallway Bathroom

AFTER pictures of the Hallway Bathroom


To see more bathrooms we've done, click HERE to see Bathrooms under the Project Photos section.